Designing a Log-Logistic-Based EWMA Control Chart Using MOPSO and VIKOR Approaches for Monitoring Cardiac Surgery Performance

Authors

DOI:

https://doi.org/10.31181/dmame712024903

Keywords:

Exponentially weighted moving average, Risk-adjustment, Accelerated failure time, Multi-objective particle swarm optimization, PSO, VIekriterijumsko KOmpromisno Rangiranje, VIKOR

Abstract

This study aims to develop a risk-adjusted Exponentially Weighted Moving Average (EWMA) control chart for computer-based performance monitoring in cardiac surgery. Patients have distinct risk factors that impact the surgical process before it even begins. As a result, risk adjustment is carried out utilizing the Accelerated Failure Time (AFT) model to consider these factors. Before using the risk-adjusted EWMA chart, the optimal parameter design should be established, considering the required statistical and economic factors. A model for Multi-Objective Decision Making (MODM) with multiple assignable causes has been proposed to accomplish this. The model is solved using a two-stage methodology based on the Multi-Objective Particle Swarm Optimization (MOPSO) method and the VIekriterijumsko KOmpromisno Rangiranje (VIKOR) method. An actual case study for cardiovascular patients has been undertaken to demonstrate the performance and effectiveness of the suggested model. The multi-objective and pure economic models have been thoroughly compared. The economic model with statistical constraints and the multi-objective model have also been compared again. The findings suggest that the multi-objective design of the risk-adjusted EWMA chart exhibits higher statistical performance in both cases against a small augment in cost.

Downloads

Download data is not yet available.

References

Yeganeh, A., Shadman, A., Shongwe, S. C., & Abbasi, S. A. (2023). Employing evolutionary artificial neural network in risk-adjusted monitoring of surgical performance. Neural Computing and Applications, 35(14), 10677-10693. https://doi.org/10.1007/s00521-023-08257-x

Mustafa, F., Sherwani, R. A. K., & Raza, M. A. (2023). A new exponentially weighted moving average control chart to monitor count data with applications in healthcare and manufacturing. Journal of Statistical Computation and Simulation, 93(18), 3308-3328. https://doi.org/10.1080/00949655.2023.2220859

Duncan, A. J. (1956). The economic design of X charts used to maintain current control of a process. Journal of the American statistical association, 51(274), 228-242. https://doi.org/10.1080/01621459.1956.10501322

Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: a unified approach. Technometrics, 28(1), 3-10. https://doi.org/10.2307/1269598

Serel, D. A. (2009). Economic design of EWMA control charts based on loss function. Mathematical and Computer Modelling, 49(3-4), 745-759. https://doi.org/10.1016/j.mcm.2008.06.012

Lu, S. L., & Huang, C. J. (2017). Statistically constrained economic design of maximum double EWMA control charts based on loss functions. Quality Technology & Quantitative Management, 14(3), 280-295. https://doi.org/10.1080/16843703.2016.1208940

Xue, L., Wang, Q., Li, C., & An, L. (2023). Economic design of residuals MEWMA control chart with variable sampling intervals and sample size. Communications in Statistics-Simulation and Computation, 1-22. https://doi.org/10.1080/03610918.2023.2257008

Rafiei, N., Asadzadeh, S., & Niaki, S. T. A. (2021). Multi-objective design of risk-adjusted control chart in healthcare systems with economic and statistical considerations. Communications in Statistics-Simulation and Computation, 52(7), 2667-2984. https://doi.org/10.1080/03610918.2021.1923744

Saniga, E. M. (1989). Economic statistical control-chart designs with an application to and R charts. Technometrics, 31(3), 313-320. https://doi.org/10.2307/3556141

Niaki, S. T. A., Malaki, M., & Ershadi, M. J. (2011). A particle swarm optimization approach on economic and economic-statistical designs of MEWMA control charts. Scientia Iranica, 18(6), 1529-1536. https://doi.org/10.1016/j.scient.2011.09.007

Amiri, A., Moslemi, A., & Doroudyan, M. H. (2015). Robust economic and economic-statistical design of EWMA control chart. The International Journal of Advanced Manufacturing Technology, 78, 511-523. https://doi.org/10.1007/s00170-014-6667-9

Katebi, M., & Pourtaheri, R. (2019). An economic statistical design of the Poisson EWMA control charts for monitoring nonconformities. Journal of Statistical Computation and Simulation, 89(15), 2813-2830. https://doi.org/10.1080/00949655.2019.1638390

Lee, M. H., Khoo, M. B., Haq, A., & Chew, X. (2023). Economic-statistical design of the variable sampling interval Poisson EWMA chart. Communications in Statistics-Simulation and Computation, 52(5), 2139-2150. https://doi.org/10.1080/03610918.2021.1898637

Rafiei, N., & Asadzadeh, S. (2022). Designing a risk-adjusted CUSUM control chart based on DEA and NSGA-II approaches A case study in healthcare: Cardiovascular patients. Scientia Iranica, 29(5), 2696-2709. https://doi.org/10.24200/SCI.2020.54743.3895

Sego, L. H., Reynolds Jr, M. R., & Woodall, W. H. (2009). Risk‐adjusted monitoring of survival times. Statistics in medicine, 28(9), 1386-1401. https://doi.org/10.1002/sim.3546

Mohammadian, F., Niaki, S. T. A., & Amiri, A. (2016). Phase‐I risk‐adjusted geometric control charts to monitor health‐care systems. Quality and Reliability Engineering International, 32(1), 19-28. https://doi.org/10.1002/qre.1722

Begun, A., Kulinskaya, E., & MacGregor, A. J. (2019). Risk-adjusted CUSUM control charts for shared frailty survival models with application to hip replacement outcomes: a study using the NJR dataset. BMC medical research methodology, 19(1), 1-15. https://doi.org/10.1186/s12874-019-0853-2

Kim, J. S., Choi, M., Kim, S. H., Choi, S. H., & Kang, C. M. (2022). Safety and feasibility of laparoscopic pancreaticoduodenectomy in octogenarians. Asian Journal of Surgery, 45(3), 837-843. https://doi.org/1016/j.asjsur.2021.09.021

Yeganeh, A., Chukhrova, N., Johannssen, A., & Fotuhi, H. (2023). A network surveillance approach using machine learning based control charts. Expert Systems with Applications, 219, 119660. https://doi.org/10.1016/j.eswa.2023.119660

Ghaseminejad, A., Kazemipoor, H., & Fallah, M. (2023). Modeling the robust facility layout problem for unequal space considering health and environmental safety criteria under uncertain parameters. Decision Making: Applications in Management and Engineering, 6(2), 426-460. https://doi.org/10.31181/dmame622023607

Mohammad, N. E. G., Rawash, Y. Y., Aly, S. M., Awad, M. E. S., & Mohamed, M. H. H. (2023). Enhancing gas pipeline network efficiency through VIKOR method. Decision Making: Applications in Management and Engineering, 6(2), 853-879. https://doi.org/10.31181/dmame622023868

Saraji, M. K., Aliasgari, E., & Streimikiene, D. (2023). Assessment of the challenges to renewable energy technologies adoption in rural areas: A Fermatean CRITIC-VIKOR approach. Technological Forecasting and Social Change, 189, 122399. https://doi.org/10.1016/j.techfore.2023.122399

Liang, W. Z., Zhao, G. Y., & Hong, C. S. (2018). Performance assessment of circular economy for phosphorus chemical firms based on VIKOR-QUALIFLEX method. Journal of Cleaner Production, 196, 1365-1378. https://doi.org/10.1016/j.jclepro.2018.06.147

Knoth, S., Wittenberg, P., & Gan, F. F. (2019). Risk‐adjusted CUSUM charts under model error. Statistics in medicine, 38(12), 2206-2218. https://doi.org/10.1002/sim.8104

Parsa, M., & Van Keilegom, I. (2023). Accelerated failure time vs Cox proportional hazards mixture cure models: David vs Goliath?. Statistical Papers, 64(3), 835-855. https://doi.org/10.1007/s00362-022-01345-5

Ding, N., He, Z., Shi, L., & Qu, L. (2021). A new risk‐adjusted EWMA control chart based on survival time for monitoring surgical outcome quality. Quality and Reliability Engineering International, 37(4), 1650-1663. https://doi.org/10.1002/qre.2818

Liu, L., Lai, X., Zhang, J., & Tsung, F. (2018). Online profile monitoring for surgical outcomes using a weighted score test. Journal of Quality Technology, 50(1), 88-97. https://doi.org/10.1080/00224065.2018.1404329

Ganguly, S. (2020). Multi-objective distributed generation penetration planning with load model using particle swarm optimization. Decision Making: Applications in Management and Engineering, 3(1), 30-42. https://doi.org/10.31181/dmame2003065g

Tavana, M., Li, Z., Mobin, M., Komaki, M., & Teymourian, E. (2016). Multi-objective control chart design optimization using NSGA-III and MOPSO enhanced with DEA and TOPSIS. Expert Systems with Applications, 50, 17-39. https://doi.org/10.1016/j.eswa.2015.11.007

Yildirim, B. F., & Yıldırım, S. K. (2022). Evaluating the satisfaction level of citizens in municipality services by using picture fuzzy VIKOR method: 2014-2019 period analysis. Decision Making: Applications in Management and Engineering, 5(1), 50-66. https://doi.org/10.31181/dmame181221001y

Published

2024-01-01

How to Cite

Nasiri Pour, A., Azizi, A., Rahimzadeh, A., Ershadi, M. J., & Zeinalnezhad, M. (2024). Designing a Log-Logistic-Based EWMA Control Chart Using MOPSO and VIKOR Approaches for Monitoring Cardiac Surgery Performance . Decision Making: Applications in Management and Engineering, 7(1), 342–363. https://doi.org/10.31181/dmame712024903